Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.
10th July 2026
4 months ago
34 minutes
Finishes at 1:08pm


Movie data last updated 1 month ago on 20th September 2026 at 8:00am (BST). Ratings last updated 2 days ago on 17th November 2026 at 5:32am (GMT). All film data including images and actor information is provided by the TMDb API, but is not endorsed or certified by TMDb. Film ratings provided by OMDb. IMDb, IMDb.COM, and the IMDb logo are trademarks of IMDb.com, Inc. or its affiliates. All product names, logos, trademarks and brands are property of their respective owners. All company, product and service names used in this website are for identification purposes only. Use of these names, logos, and brands does not imply endorsement.